Issues before deal    

         TimeLine                          Providing

     Before Production         Drawings, Part List, Delivery Date, Shipping Terms

     During Production         Production Schedule, Updated Pictures

      After Production           Handle the Shipment Directly to Consumers Door,

                                                   Inform the shipping Terms, ETA&ETD

Delivery Date

         Products                         Delivery Date

     FV, BBT, HLT, CLT                           35days

            Brewhouse                             65-70days

Productions process 

Meanwhile a manufacturing time agenda and “Project Management Scheme ” will be worked out for the production process will be sent to client to help arrange the local issues.
The production will start after clients confirming the designed flow chart drawing, singe tanks drawing etc, other drawings like layout, detailed fittings, piping etc could be done during production process, which shortened the delivery time.
The whole production process will be kept posted with client. From material preparation, polishing process, pressure/leakage testing, assembling work, container loading etc.

Transportation arrangement

The equipment packaging will be done by us, mainly use steel frame package, to make sure the equipment is suitable for long time shipment.
Full Experience in handling shipment and Custom Clearance. If needs help in shipment, just tell us, we can handle whole shipment from factory to your brewery.

Warranty and after sales service

XG warrants full service and support over the life time of the equipment and the installation. Technical service is available on demand and – if requested – on site as well. Our customer oriented service department is dedicated and committed to offer quick and efficient services and responds to customer requests. Also we will provide you a warranty statement with your Contract.

An official Warranty Statement will send you along with our Sales-Contract.